S19hyro ,S19xp hyro,S19 pro+ Crypto Asic Miner Cooling system Box

Short Description:

Cooling Box S19 Hydro XP ,Whatsminer M50,Whatsminer M53

1.High Performance Computing:

Crypto ASIC, AI GPU et al

2.Computing heat capture system

3. Heat supply system

• Solar

• Wind

• SMR Nuclear

• Green house heat supply

• Fishery industry

• Poultry industry

• Building heating

• Pool heating

• Grain, wood drying


Product Detail

Product Tags

Product Description

The HYDROBOX is compatible with Bitmain's S19 Hydro XP, the most energy-efficient mining rig on the market.An outdoor computing infrastructure unit with the highest capacity in the current fleet. 

Hydro Box

An outdoor computing infrastructure unit with the highest capacity in the current fleet. The HYDROBOX is compatible with Bitmain's S19 Hydro XP, the most energy-efficient mining rig on the market.

TOTAL POWER :1130KW

HASHRATE:50PH/s

SERVER HOSTING CAPACITY:210 UNITS(Whatsminer M53)

BITMAIN ANTSPACE HK3

RACKBOX

Highly mobile and resilient outdoor computing infrastructure unitrunning on rack-mounted liquid cooling. Capable of hosting up to 90units of the most advanced 2U standard servers. Compatible with allrack-mounted liquid-cooling models (e.g., Whatsminer M53). Equippedwith an external cooling tower and is made ready for highly efficientreuse of waste heat.

TOTAL POWER :930KW

HASHRATE:26.1PH/s

SERVER HOSTING CAPACITY:90 UNITS(Whatsminer M53)

BITMAIN ANTSPACE

TANKBOX

Highly Mobile and resilient outdoor computing infrastructure unit fittedinside a standard 20ft container. Capable of withstanding temperaturesranging from -40°F to 122°F. Runs on immersion cooling tanks that areable to convert air-cooled servers into liquid-cooled modes. Equippedwith an external cooling tower and made ready for high-efficiency reuseof waste heat.

TOTAL POWER :630KW

 CRYPTO ASIC MINER COOLING SYSTEM

How to Purchase The Mining Machine

ORDER PROCESS

Payment Terms

Miner Payments

 

Shipping Ways

SHIPMENT

Packing Way

PACKAGE

FAQ

Q1: How long can I get the ordered products?

After you pay the sample charge and send us confirmed files, the goods will be ready for delivery in 4-8 working days. If the products are in stock,we will delivery it within 48 hours!

Q2: What is the location of your company?
Our Factory  is located at Longgang District, Shenzhen, Guangdong, China

Q3: What‘s the price of needed products ?
Because of the changing of the market, the price changed per day, please feel free to ask our sales.

Q4:How about the Warranty?

365 days warranty for new machine


  • Previous:
  • Next:

  • Related Products